Service hotline: 0755-85268876
 
 
Products Products
产品名称: KA-1300 * 1850 full automatic bubble machine
上市日期:2015-05-13



Fully automatic gantry high-pressure bubble remover KA-1300*1850 is the finished equipment integrated with electromagnetic heating and automatic opening of door and ismainly designed for LCD module production line to remove bubbles in LCD board detected during polarizer calibration upon the completion of process between polarizer &LCD glass and ITO film & glass. . This equipment removes bubbles generated during the bonding of polarizer By taking advantage of pressure and temperature. Theprocedure would enhance the bonding force between various materials and is also useful for liquid crystal cell vacuum bubble removal and other processes.


Operation sequence control for the equipment is performed through PLC while the operation conditions like temperature, air pressure and operating time etc. arecontrolled via intelligent programs. . Compact, space-saving, reliable and unique interlock safety protection device with multiple protections assure efficientinflation and deflation and safe opening/closing of door; the complete set of equipment features rational structure, high degree of automation, reliable and safeoperation, simplified operation and high productivity etc.


Working chamber of the equipment is fabricated from SUS304 rust-proof material. . Chamber space could be customized according to user’s requirements.


This equipment is manufactured according to GB 150-1998 as a national standard of the People’s Republic of China and is examined &inspected according to JB 4730-1774


standard of former National Machinery Commission, while being under the jurisdiction of Pressure Vessel Safety Technology Supervision Regulation.


◆ Through electromagnetic induction heating, electrical energy is converted into magnetic energy that acts on the body of pressure chamber (encircling coil withstainless steel wall) and thus enabling material molecules to perform relative movement for frictional heating. This saves intermediate heat conductor, improves powerutilization rate and provides an effective solution for uneven temperature and inaccurate temperature control; in this process, the power utilization rate reaches upto 95% or higher. Furthermore, this device incorporates supersonic frequency technology that assures zero electromagnetic noise and electromagnetic interference after technical treatment


◆ Natural cooling.

◆ Two operating modes (manual/automatic).

◆ It’s possible to adjust dwell time (0~60 minutes) and door opening delay period (0~10 seconds) according to process requirements;.

◆ High-precision air filter is provided.

◆ Famous-brand PLC control system is used with 5.6-inch color human-machine interface; Parameters are presented through curves to facilitate the operation.

◆ Double-safety protection structure for pressure, temperature, mechanics and electrics


II. Automatic Operation Procedure


I. Turn on the power (check if the voltage is normal: 360-400V).

II. Set the upper limit of temperature: 60℃ (default value).

III. Set the upper limit of pressure at control panel (man-machine interface): 5.0kg/f (default value).

IV. Set dwell time - 0~60 minutes (10 minutes by default).

V. Set door opening delay - 0~10s (5s by default).

VI. Put materials to be processed into chamber..

VII. Select automatic operation (go into operation) on man-machine interface, press start button to activate the equipment.

VIII. Upon the completion of procedure, self-locking structure returns to its original position (mechanically/electrically), and the door is automatically opened for


reclaiming. At this point, the current operation is finished..

IX. Repetition from Paragraph 6



Product Description:
  • Function
  • Specifications
  • ConnectionDiagram
  • Panel
  • Download



Fully automatic gantry high-pressure bubble remover KA-1300*1850 is the finished equipment integrated with electromagnetic heating and automatic opening of door and ismainly designed for LCD module production line to remove bubbles in LCD board detected during polarizer calibration upon the completion of process between polarizer &LCD glass and ITO film & glass. . This equipment removes bubbles generated during the bonding of polarizer By taking advantage of pressure and temperature. Theprocedure would enhance the bonding force between various materials and is also useful for liquid crystal cell vacuum bubble removal and other processes.


Operation sequence control for the equipment is performed through PLC while the operation conditions like temperature, air pressure and operating time etc. arecontrolled via intelligent programs. . Compact, space-saving, reliable and unique interlock safety protection device with multiple protections assure efficientinflation and deflation and safe opening/closing of door; the complete set of equipment features rational structure, high degree of automation, reliable and safeoperation, simplified operation and high productivity etc.


Working chamber of the equipment is fabricated from SUS304 rust-proof material. . Chamber space could be customized according to user’s requirements.


This equipment is manufactured according to GB 150-1998 as a national standard of the People’s Republic of China and is examined &inspected according to JB 4730-1774


standard of former National Machinery Commission, while being under the jurisdiction of Pressure Vessel Safety Technology Supervision Regulation.


◆ Through electromagnetic induction heating, electrical energy is converted into magnetic energy that acts on the body of pressure chamber (encircling coil withstainless steel wall) and thus enabling material molecules to perform relative movement for frictional heating. This saves intermediate heat conductor, improves powerutilization rate and provides an effective solution for uneven temperature and inaccurate temperature control; in this process, the power utilization rate reaches upto 95% or higher. Furthermore, this device incorporates supersonic frequency technology that assures zero electromagnetic noise and electromagnetic interference after technical treatment


◆ Natural cooling.

◆ Two operating modes (manual/automatic).

◆ It’s possible to adjust dwell time (0~60 minutes) and door opening delay period (0~10 seconds) according to process requirements;.

◆ High-precision air filter is provided.

◆ Famous-brand PLC control system is used with 5.6-inch color human-machine interface; Parameters are presented through curves to facilitate the operation.

◆ Double-safety protection structure for pressure, temperature, mechanics and electrics


II. Automatic Operation Procedure


I. Turn on the power (check if the voltage is normal: 360-400V).

II. Set the upper limit of temperature: 60℃ (default value).

III. Set the upper limit of pressure at control panel (man-machine interface): 5.0kg/f (default value).

IV. Set dwell time - 0~60 minutes (10 minutes by default).

V. Set door opening delay - 0~10s (5s by default).

VI. Put materials to be processed into chamber..

VII. Select automatic operation (go into operation) on man-machine interface, press start button to activate the equipment.

VIII. Upon the completion of procedure, self-locking structure returns to its original position (mechanically/electrically), and the door is automatically opened for


reclaiming. At this point, the current operation is finished..

IX. Repetition from Paragraph 6



Copyright ©2005 - 2013 Shenzhen KEF Industrial Equipment Co., Ltd. Copyright
犀牛云提供企业云服务
Address: Bao'an District of Shenzhen City West township west into Kyrgyzstan Mei Wo Building, 13th Floor
Phone: 0755-85268876
传真:+86 0755-2788 8009
邮编:330520